The Helical anchors were recessed into lawn boxes that can be accessed when the tent is erected and will provide support to the tent guy wires, allowing proper tensile support in a strong wind load area, and ease of erecting and removing the tent during event set-up and tear down.
OCEAN HOUSE HOTEL
HELICAL PIER INSTALLATION
Once the piers were installed they were cut and capped using a custom pier cap that was welded to the pier pipe and connected to a clevis that will allow for easy attachment of the tent guy wires.
Due to a septic leaching field, one line of the Helical Anchors had to be designed to straddle between the septic fields and the guy wire attachments were connected via channel welded to the Helical Anchors.
Once the anchors were installed and capped, the site contractor graded the lawn and placed the lawn boxes that will be recessed into the lawn.
Due to cold weather striking early, the new turf was not able to be placed, therefore temporary lawn was hydro-seeded and fenced off while the remaining landscaping continues.
Next spring this lawn will be ready for use and tents will be assembled and disassembled with ease for events along this beautiful shore line.
Our new Website is currently under construction, please check back soon to see it completed soon.
http://www.nefsri.com/
To learn more about ECP Products please visit
http://www.earthcontactproducts.com/
To learn more about ECP Products please visit
http://www.earthcontactproducts.com/